1. Before the operation, turn on the air pressure, adjust the
pressing time, place the shoes into the sealed rubber air bag at
will.
2. Closed the cover lid, the compressed air is automatically
inflated, after reached the set time, its automatically exhausted
quickly, open the cover lid to take out the shoes.
3. Double Station work takes turns.